Your location: Home >Service and Support > Connecting rod installation diagram
Connecting Rod Installation Diagram
Rod Length calculation method
Central door lock body rotation certer line
coincides with the connecting rod length calculation:
L1=F/2-A+(DM-2)
L2=F/2-B+(DM-2)
 
Door center coinciding with the center line
of the lock rod length calculation:
L1=F/2-[A+(D/2-C]+(DM-2)
L2=F/2-[B-(D/2-C]=(DM-2)
Note:If connections (eg LG03 LOG9F),Should lose connections
The effective length, the calculation method is suitable for the installation of rod seal
The length of the calculation; its calculation method for reference only and should be used to consider
The actual installation conditions rod;
DM: Transmission telescopic stroke code
F: door opening height
Request for the Paper Catalogue
Your information has been successfully submitted. Our staff will send you the latest paper catalog as soon as possible.
Request for the Paper Catalogue
We've received your request, and will contact you to confirm your express information. Please wait for a moment.